Installed Base Replacement Intelligence for Water Utilities

    Predict replacement opportunities 12–36 months before RFPs — using your historical sales data.

    Most water-sector vendors already know what they sold.
    Very few know when utilities will replace it.

    AquaIntel transforms 10–15 years of installed base data into probability-weighted replacement opportunities, so your sales teams engage before specs are written and competitors appear.

    Asset Lifecycle Timeline

    2011
    Install
    2015
    Operate
    2020
    Age
    2025
    Signal
    2027
    Replace

    Your Largest Revenue Pool Is Invisible

    Installed Base Reality

    • Millions in historical equipment sales
    • Pumps, valves, membranes, analyzers aging in the field
    • Replacements are inevitable

    What Happens Today

    • Sales learns via RFP portals
    • Service reacts after failures
    • Timing based on gut feel
    • Specs already locked

    Business Impact

    • Late-stage competition
    • Margin pressure
    • Lost incumbency advantage
    • Unpredictable pipeline

    "Your biggest competitor isn't pricing — it's timing."

    Replacement Intelligence — Not RFP Tracking

    AquaIntel does not scrape bid portals.
    We don't wait for failures.

    We model infrastructure inevitability by combining:

    • Your installed base history
    • Utility capital planning behavior
    • Funding access and procurement patterns
    • Asset lifecycle benchmarks
    Installed Base Data
    Capital & Funding Signals
    Lifecycle Modeling
    Replacement Intelligence

    How It Works

    01

    Upload Historical Sales

    Excel is fine.

    • Utility name (sold-to)
    • Asset category
    • Install year (exact or estimated)
    • Quantity / value (optional)
    02

    AquaIntel Enrichment

    We layer in:

    • Utility size, governance, procurement thresholds
    • Capital improvement cycles (CIP)
    • SRF / IIJA / bond funding signals
    • Regulatory pressure and asset criticality
    • Known engineers and spec influencers (where available)
    03

    Replacement Intelligence

    For each installed asset, we generate:

    • Replacement window (earliest / most likely / latest)
    • Replacement Opportunity Score (0–100)
    • Deal size estimate
    • Confidence level
    • Recommended engagement timing and motion

    What You Get

    Replacement Opportunity Dashboard

    • Ranked list by score and timing
    • Filter by territory, category, year
    • Clear 'why this matters' drivers

    Account-Level Briefs

    • Installed assets nearing replacement
    • Capital readiness indicators
    • Funding likelihood
    • Who to engage and when

    CRM-Ready Actions

    • Salesforce / HubSpot exports
    • Auto-created rep tasks
    • Optional opportunity creation

    Example Insight

    Utility:Mid-size municipal authority
    Installed Asset:Vertical turbine pump (installed ~2011)
    Replacement Window:2026–2028
    Opportunity Score:82 / 100High confidence
    Estimated Deal Size:$650k

    Recommended Action:

    Begin budgetary discussions in Q3 2025 with Utility Manager and consulting engineer.

    This is the conversation before an RFP exists.

    Dashboard: Replacement Opportunity Radar

    Near-term opportunities (0–24 mo)

    6opportunities

    Estimated pipeline (next 36 mo)

    $8.9M(midpoint)

    High-confidence share

    58%(7/12)

    Productivity lift

    +20–35%revenue/rep

    Increase revenue per rep by reallocating time from low-signal accounts to high-confidence replacement windows.

    Asset category:All
    Replacement window:All
    Confidence:All
    Utility type:All
    Sales channel:All
    #UtilityAssetInstallReplacement WindowScoreEst. Deal
    1Sunset Water & Sewer(FL)Pump — Split-case2009Med2025–2026–2027
    88
    $1.40M
    2ALCOSAN(PA)Blower — Turbo2013Med2025–2026–2028
    79
    $1.80M
    3City of Waco(TX)Pump — Split-case2010Med2025–2026–2027
    77
    $0.68M
    4San Antonio Water System(TX)Valve — Gate 24"2011Med2026–2027–2029
    76
    $0.31M
    5Denver Water(CO)Pump — High lift2012High2026–2027–2029
    74
    $1.25M
    6EBMUD(CA)Instrumentation — NH4 analyzers2017High2028–2030–2032
    70
    $0.26M
    7Blue Ridge Utilities(NC)Pump — Submersible2013Low2026–2028–2030
    69
    $0.51M
    8City of Irvine(CA)SCADA — RTU upgrades2016High2027–2029–2031
    67
    $0.62M
    9City of Rochester(NY)Valve — Butterfly 36"2008Low2024–2026–2028
    66
    $0.28M
    10City of Tampa(FL)Membrane — UF skids2012Low2025–2027–2029
    64
    $1.95M
    11City of Madison(WI)Aftermarket — pump rebuild kits2018High2026–2027–2028
    58
    $0.18M
    12City of Plano(TX)SCADA — PLC kits2013Med2026–2028–2030
    55
    $0.48M
    Score Legend: 80–100 Immediate 65–79 Near-term 50–64 Watch <50 Park

    More revenue per rep — not more reps.

    AquaIntel prioritizes the same sales team toward high-confidence replacement opportunities before RFPs appear.

    *Illustrative estimates; final values depend on installed base and territory capacity.

    Why Vendors Use This

    Before AquaIntel

    With AquaIntel

    Reactive RFP chasing
    Proactive replacement timing
    Specs already locked
    Early spec influence
    Price-driven competition
    Value-led conversations
    Uncertain pipeline
    Predictable, explainable pipeline

    Who It's For

    Pump, valve, blower OEMs
    Membrane & treatment system vendors
    SCADA, instrumentation & analytics companies
    EPCs & integrators
    Aftermarket & lifecycle sales teams
    PE-backed platforms seeking predictability

    6–8 Week Replacement Intelligence Pilot

    See the value before you commit.

    Pilot Scope

    • 1–2 asset categories
    • 10–30 utilities or defined installed-base slice
    • Full scoring + dashboards
    • CRM-ready outputs

    What to include in your CSV:

    • • Product name
    • • Year of sale
    • • Product specification
    • • Model number
    • • Any other relevant data

    Request a Pilot Analysis

    CSV or Excel with: Product Name, Year of Sale, Specification, Model, etc.

    Click to upload or drag and drop

    CSV, XLS, XLSX (max 10MB)